BIM (Building Information Modeling) 5D = 3D (geometry) + 4D (time/scheduling) + 5D (cost/estimation & budget control). It integrates cost data into the BIM model, allowing teams to automatically generate, update, and analyze cost estimates as the design or schedule changes.

In short → 5D BIM connects design + time + cost into a single intelligent model.

  • Architecture

    • Architects can evaluate design alternatives based on cost impact.

    • Helps in value engineering at concept stage.

  • Engineering

    • Engineers can simulate design changes vs. cost implications.

    • Structural or MEP design updates immediately reflect in the cost model.

  • Construction

    • Contractors use 5D for accurate BOQ/QTO (Bill/Quantity Takeoff).

    • Enables real-time cash flow forecasting and procurement planning.

  • Automated Cost Estimation: Extract quantities directly from the BIM model.

  • Dynamic Cost Updates: Any change in 3D/4D reflects immediately in the 5D cost model.

  • Cost Visualization: Highlight expensive elements within the 3D/4D model (color coding).

  • Integration with ERP/BI: Link to tools like Power BI, SAP, or Oracle Primavera for project controls.

  • Visual Cost-Loaded Schedule: See exactly which activity drives costs at what time.

Architectural

BIM Architectural enables design, modeling, visualization, coordination, documentation, analysis, accuracy, efficiency, collaboration, detailing, planning.

Structural

BIM Structural enhances modeling, detailing, analysis, coordination, accuracy, efficiency, documentation, collaboration, steel, concrete, rebar, safety.

MEP

BIM MEP enables modeling, coordination, clash detection, design, analysis, accuracy, efficiency, HVAC, plumbing, electrical.